groovymar1037 groovymar1037
  • 22-01-2024
  • Engineering
contestada

Engineering cost estimates are usually based on operating conditions that are considered:
A. optimal.

B. practical.

C. attainable.

D. historical.

E. realistic.

Respuesta :

Otras preguntas

what is another name for plane Z? ( 1 point)
The graph below shows a line of best fit for data collected on the total cost of a ride share service in relation to the distance traveled, in miles. Total Ride
HELP ASAP!!! WILL MARK BRAINLIEST!! What are the coordinates of G after it is reflected over the x-axis?​
Elucidate the importance of an animal doctor.​
can someone please explain this?? how do u get 5
Express in simplest radical form.
A rectangular lawn is 20 yards by 28 yards. It would cost $4.80 per yard to install a fence around the lawn. How much would it cost to put a fence around the la
AABC and AADE are similar. Find the length of of side DA 4
Essa conta poderia ser feita de várias maneiras. Uma delas é dividir 450 por 3 e depois multiplicar por 5. A resposta para esse problema é 750.
change each of the following numbers into scientific notation d) 0.000 000 000 000 001 72 f) 568,200,000,000,000 g) 0.000 000 081 h) 0.000 000 000 000 904 i) 7,