ryandublin2162 ryandublin2162
  • 22-02-2024
  • Computers and Technology
contestada

A project manager needs a tool to create a project charter. What type of tool should they use?

a) Gantt chart
b) Work breakdown structure (WBS)
c) Project management software
d) Project charter template

Respuesta :

Otras preguntas

b. Use the Vander Waal equation to calculate the pressure of 1.00 mol of Cl₂ in a volume of 30.0L at a temperature of 600.0K. And determine the relationship bet
Consider these graphed number lines. 4 number lines going from negative 5 to positive 5. Graph A: closed circles are at negative 5 and positive 2. Everything to
What is the probability that a five-card poker hand does not contain the queen of hearts?
Abraham lincoln fully supported president polk's justification for declaring war against mexico in 1846. group of answer choices true false
In buddhist thought, death can be an evil because __________. group of answer choices
15. You want to design an experiment using 800 marbles and you want six different colors-blue, red, green, yellow, purple, and pink. You also do not want more t
What is the least common denominator of 8/9 and 1/12
Within the first week after conception, the cells of the zygote begin to ___________. in other words, the cells begin to specialize in structure and function.
What is the value of 3-(-2)?
A substance that conducts an electric current when dissolved in water is called a(n)?