kandigirl13091 kandigirl13091
  • 26-03-2024
  • Computers and Technology
contestada

When a team member is not sure of his tasks and comes to the project manager for clarity, he should be given the documents that have all the details of work packages. Which documents contain that information?
a) Project schedule
b) Work breakdown structure
c) Activity list
d) Risk management plan

Respuesta :

Otras preguntas

Today, the majority of mass-media outlets are owned by six corporations. this is a product of ___.
in what section of the US were the most rail lines concentrated
Two factors of 30 that add up to 9 what are they
The line 3x+4y=24 cuts the x-axis at point A and the y-axis at B. Find The coordinate of A and B The length of AB Point C is on the line such that C is equidi
Jackson has 50 megabytes (MB) of space left on his smartphone. He can download songs that each use 3.5 MB or videos that each use 7 MB. He wants to download at
Calculate the mass of a liquid with a density of 3.2 g/ml and a volume of 25 ml
Given f(x) = 6 (1-x) what is the value of f (-8)
What would happen if you took an antacid prior to eating a hamburger?
How is twelve divided by fifteen equal to eight.
Why is water considered a pure substance, while milk is not?