destinywyatt98411 destinywyatt98411
  • 26-03-2024
  • Mathematics
contestada

Alpha can do a piece of work in 20 days. beta is 25% more efficient than alpha. The number of days taken by beta to do the same piece of work is
a. 15
b. 16
c. 18
d. 25

Respuesta :

Otras preguntas

Trigonometry Objective: Use trigonometry functions to find the area of triangles. In ΔXYZ, XY=13, XZ=8, and m< x=34*. Find the area of ΔXYZ, to the nearest
15 POINTS AND BRAINLIEST IF YOU ANSWER CORRECTLY Answer each using this word bank: 1. TEMPERATURE 2. THERMAL ENERGY 3. CONDUCTION 4. CONVECTION 5. RADIATION A s
Who was Mansa Musa? who ever can awnser asap gets 15 pints
Acob is putting carpet in his house. He wants to carpet the living room, which measures 15 ft × 12 1 3 ft. He also wants to carpet the dining room, which is 10
In a playground, there is a small merry-go-round of radius 1.20 m and mass 160 kg. Its radius of gyration is 91.0 cm. (Radius of gyration k is defined by the ex
How does a star's life begin?
1 1/3 is greater than blank and less then blank
A gray wolf's sperm contains 393939 chromosomes. He mates with a female gray wolf. How many chromosomes will there be in the resulting zygote?
DIP Partnership reports ordinary income (before guaranteed payments) of $120,000, rent expense of $40,000, and interest income of $4,000 for the year. In additi
if the temperature is -4 and rises by 12 degrees what is the new temperature