The critical path in a project represents the longest sequence of dependent activities that determine the project's duration.
a. True
b. False

Respuesta :

Otras preguntas

On average, about 45,000,000 gallons of water flow over the Niagara Falls in 60 seconds. About how much water flows over the Niagara Falls in one second?
A review is a type of Persuasive Writing. True False
Gagaku is a Form of drumming Wind instrument used in the royal court Dance step practiced by the commoners Style of traditional Japanese music
Which of these is not a characteristic of living things? All living things are made up of cells. All living things are based on a universal genetic code. All li
How does the use of the word "official" in this stage direction affect the mood of the scene? It suggests that the Sheriff is an honest man with great integrity
Which nucleic acid can carry the protein synthesis instructions from the nucleus to the ribosomes? DNA RNA Monosaccharides Endoplasmic reticulum
If angle 4 is 25°, what is the measure arc FBE?
A fire is an example of an exothermic reaction. Which of the following best supports that statement? A. The fire is creating energy. B. The fire is releasing en
. Solve for x. a) 10 - 1/4x - 7 b) 3 (x + 8 ) = 21
what major events happened while gerald ford was president