Cjdjejfjiv28901 Cjdjejfjiv28901
  • 26-04-2024
  • Mathematics
contestada

24 men complete a given job in 40 days. then how many men are required to complete the job in 32 days
A.30
B.40
C.25
D.50

Respuesta :

Otras preguntas

For every 5 yard you run jill run 6 yard if you have run 30 yard then how far jill run.
What is the fraction of 36000
Multiple Representations How to convert the length 7 centimeters to meters. Compare the numerical values when both numbers are written in scientific notation
sally and Hans started counting at the same time. sally counted on by tens from 300.Hans counted back by hundreds. after six counts, they had reached the same
"what human body system could be fossilized?"
how do I simplify 8 to the power of negative 2
The use of iron for tools and weapons developed later than the use of copper because iron?
who led the mormons to present day utah in search of religious freedom
What can a food surplus lead to?
1.063636363 repeated to a fraction?