Process Id

Arrival time

Burst time

P1

3

1

P2

1

4

P3

4

2

P4

0

6

P5

2

3
If the CPU scheduling policy is Shortest Job First (SJF) preemptive, draw Gantt chart, calculate the average waiting time and average turnaround time.

Respuesta :

Otras preguntas

how might the location of South Korea influence its location and politics?
What is the answer to this: 35% of 300?
the perimeter of a rectangular painting is 368 centimeters is the length of the painting is 97 centimeters what is the width
Find the unit rate $1.2 for 8.2 ounces
Traducción correcta del adjetivo posesivo en la siguiente oración. La entrenadora nuestra es muy buena
what is the setting of this short story
Given BD= 24 and PC= 13, find PB
How do u solve a and b plz need help
find the cost of papering the four walls of a room 16 meters long, 12 meter broad and 8 meters high with paper 2 decimeters wide at 50 paisa per meter
What is 4/5 - 1/2 ? I need help with my maths essay!