pastaback93 pastaback93
  • 22-10-2018
  • Mathematics
contestada

A group of workers can plant 36 acres in 9 days what is their rate in acres per day

Respuesta :

parkerfreeze
parkerfreeze parkerfreeze
  • 22-10-2018

It would be 4 acres in 1 day because 9/9=1 and 36/9=4.

Answer Link
Аноним Аноним
  • 22-10-2018

Answer:

[tex]Answer=4[/tex]

Step-by-step explanation:

36/9 would equal 4.

So if you do 9 x 4, it would equal 36.

So therefore you can multiply 9 x 4 or 4 x 9.


Answer Link

Otras preguntas

Scientists and engineers design new technologies to help solve problems. Often, a new technological design will contain a flaw. Which of the following is true a
Which of the following would fit these sentences? 1. Es importante comer de ___________ grupos de comidas cada dia 2. Estoy __________contigo(with you); los gui
Ida B. Wells’s book The Red Record exposed the corruption of the Standard Oil monopoly. exposed the corrupt practices of the railroad industry. exposed the hor
Graphing trigometric functions
Tornadoes form in unusually violent thunderstorms when there is sufficient (1) instability and (2) wind shear present in the lower atmosphere. Elaborate on what
Given: m∠ADB = m∠CDB AD ≅ DC Prove: m∠BAC = m∠BCA BD⊥ AC
which area of the world was the mostly affected by the decision making of the berlin conference
Find the value of X.
Please select the word from the list that best fits the definition Possibly ANSWER IS qualified
I’m so confused please help!