bwheeler8209 bwheeler8209
  • 26-02-2019
  • Business
contestada

Who can sign a determination and findings justifying the use of an award-fee contract

Respuesta :

MrsTriplet MrsTriplet
  • 07-03-2019

A person that in at least one level higher than the contracting officer is allowed to sign a determination and findings justifying the use of an award-fee contract. An award fee contract is defined as additional profit or fee aount that is awarded based on evaluations during different periods of time for contractors on their performance. This type of evalution is done based on the specific company and their needs.  

Answer Link

Otras preguntas

can someone please help me?
Please help its due super duper soon and im the worst EVER at math
Which literary device is this the best example of?
HELPPPP PLEASEEEEEE HELP ME
A calico cat has both black and orange spots, which demonstrates a codominance pattern. What would be their expected genotype?
here please help just these two
What is the midpoint of the segment shown below?
Distinguishing Characteristics Choose the word that best completes each sentence. Plants are ____. They make their own food. Animals are _____. They consume oth
Can someone please explain how to simplify expressions that have negative or positive exponents
Write an equation expression with positive exponents only.