Qn.11 plz help this with step ​

Qn11 plz help this with step class=

Respuesta :

salatulmaghrib
salatulmaghrib salatulmaghrib
  • 25-07-2019
The answer is 7.5 days
explanation:
80 is four times 20.
80 people should be able to do the job four times faster than 20 people.
So, they should take 1/4 the time.
If 20 people take 30 days, 80 people should take 30/4=7.5 days.
**
simpler explanation:
30*20/80=7.5
Answer Link

Otras preguntas

how does lady macduff view macduff flight from scotland
Simplify [tex] \frac{8b^{3}}{ 20b^{3} } [/tex]
The market value of cell phones made and sold in America by a Japanese-owned company is included in _
Which item is NOT a characteristic of a civilization? temporary structures and a migrating food source permanent housing and monuments a system of writing and a
hat was the main impact of the completion of the Panama Canal? increased world trade Panamanian prosperity U.S. military dominance increased political stability
What colors of visible light do green plant leaves absorb the most? A. green and red B. red and blue C. blue and green D. green and violet
Find the value of k so that the line through the given points has slope m. (2k, 3) and (1, k) ; m=2
Where did fighting continue after the spanish forces in cuba surrendered? a. Tampa, Florida b. Puerto Rico c. the Philippines d. Guantanamo Bay
what is the eighth term of the sequence 2,8,32,128
Which of the following is a declarative sentence? A. Where is John taking Mary on their date? B. John asked Mary to go on a date. C. John and Mary are dat