mianoel2003 mianoel2003
  • 23-09-2019
  • Mathematics
contestada

How many cubic yards of concrete would be needed to fill a foundation hole that is 3 ft. wide, 6 ft. long and 3 ft. deep?

Respuesta :

Аноним Аноним
  • 23-09-2019

Answer:

2 cubic yards.

Step-by-step explanation:

The volume of the hole in cubic feet

= 3 * 6 * 3

= 54 cubic feet.

There are 3^3 = 27 cubic feet in 1 cubic yard so the answer is

54 / 27 = 2 cubic yards.

Answer Link

Otras preguntas

Someone please help me!
Nick has 3 shirts: a white one, a black one, and a blue one. He also has two pairs of pants, one blue and one tan. What is the probability, if Nick gets dressed
A ___ is a system of basic rules and principles by which a government is organized.
Russell runs 9.10 mile in 5 minutes. At this rate, how many miles can he run in one minute?
New ideas from the 1400s (15th Century) through the 1600s (17th Century) changed the way people live?
helpp plsssss my sis needs it
plss help me this is music​
Joe leaves his house at 07.00am. He drives 180 miles at an average speed of 72 miles per hour to reach his destination. At what time does Joe reach his destinat
Is -77 a integer? Anyone help pls
how to round to the nearest 1000 even if there is no thousands in the number given​