Micaelamg7014 Micaelamg7014
  • 23-01-2020
  • Business
contestada

Compare and contrast Borealis’old financial plan-ning and control system with its new system.

Respuesta :

rehman851
rehman851 rehman851
  • 23-01-2020

Answer:

Old: Budget controlled by financial controller

New: Budget not controlled by financial controller

Old: Budget provide control over cost structure

New: Set target for variable and fixed costs by benchmarking competitors

Old: No freedom to spend money

New: Freedom to spend money to meet benchmark.

Answer Link

Otras preguntas

How do we measure the acidity of rain?
A box has sides with these measures: length 10 cm, width 8 cm, height h cm. If the volume is 400 cm3 , find the measure of the height. You may use the equation
I need help please Find the value of numerical expression can you explain it to me please 2^4
A Labrador retriever breeder needs to determine if three male pups who were born to Sadie, his black Labrador retriever, are the offspring of Sam, a yellow Labr
What is the lcm of two numbers if one number is a multiple of the other give example
21/36 in simplest form
gene defects, infectious agents, and congenital malformations are ____________ that can cause and contribute to the onset or severity of a child's illness? a.bi
Cecilia is making shorts with 8 belt loop. To make the loops, she needs 8 strips of fabric. Each strip measures 1 1/4 inches wide and 7 inches long. What is the
Why did the public fear early unions
The table below shows the outputs y for different inputs x: Input (x) 1 1 3 3 Output (y) 4 2 12 6 Part A: Does the table represent y as a function of x? Justify