kalpanathakulla680 kalpanathakulla680
  • 23-02-2020
  • Mathematics
contestada

30 men can do a piece of work in 40 days .how long it take to complete the work if 5 men were reduced​

Respuesta :

Аноним Аноним
  • 23-02-2020
30 men -> 40 days
1 man -> 1/1/3 days
30-5men = 25 men
25 men -> 1/1/3 x 25
= 33/1/3 days
Answer Link
tolaosunrinde
tolaosunrinde tolaosunrinde
  • 23-02-2020

Answer: 48 days

Step-by-step explanation:

If it takes 30men 40days to complete a task, 1 man takes 30×40= 1200 days

25 men will therefore take 1200/25= 48 days.

Answer Link

Otras preguntas

1. Match them together.Deforestation, combustion, circulation, weathering, calcium carbonateA.the burning of fossil fuels to make energyB.the primary component
How many times can 90 go into 3?
A car accelerates from 15 m/s to 25 m/s in 15 s. What is the car's acceleration?
how do you solve this equation . Q=3a+5ac
How to do exponential form 9.9.9.9.9.9
How do I solve this 24+3.1+(-44)+(-8.2)+63
Please help. What mass of copper is required to replace silver from 4.00g of silver nitrate dissolved in water? I found the molar mass of all of them but don't
Solve for x: 8 is to 64 as 2 is to x
Find x so the distance between (x,2) and (1,5) is 13.
Write the expanded form of 6,985,062 using exponential notation