Chris is a project manager. He would like to schedule a status meeting for the next week. Several of the group members work at another site. What should Chris do?

Respuesta :

6mrpll
6mrpll 6mrpll
  • 22-04-2020

chris should make a website so everyone can join and have a talk about the meeting

Answer Link

Otras preguntas

A ramp is often used to raise an object. if 90 joules of energy are needed to lift an object to a platform but 100 joules are used in rolling the object up the
What is the current in the 1100 w (120 v ) hair dryer when it is used?
Sleepwalking will most likely occur during which part of the night?
Which pronouns act as the object in a sentence? Check all that apply. her ?? me ?? he they us ?? ??’s are the ones that I think r correct, correct me if I’m wro
To identify genes that put people at risk for depression, researchers have used what tests?
The quadrilateral ABCD is a rhombus with BD = BC. On the side AB a point M is taken so that the measure of ∠ADM is 20% smaller than the measure of ∠BAD. Find t
Four students have applied to a special program and only one can be accepted. they have taken a battery of 12 tests and all have exactly the same average score.
The distance between consecutive flaws on a roll of sheet aluminum is exponentially distributed with a mean distance of three meters. a.what is the mean number
Sue's tyre pressure gauge shows a reading which is 8% higher than the actual pressure. what is the actual pressure when Sue's gauge shows 39.42? show how you go
Green plants alagae and some bacteria capture solar radiation to convert it to oranic molecules in process called