michaelwwilliams128 michaelwwilliams128
  • 25-04-2020
  • Mathematics
contestada

Working alone, Jared can dig a 10 ft by 10 ft hole in five hours. James can dig the same hole in six hours. How long would it take them if they worked together?

Respuesta :

alextrejo789
alextrejo789 alextrejo789
  • 25-04-2020
2 hours and 44 minutes
Answer Link
MikkalThomas14
MikkalThomas14 MikkalThomas14
  • 25-04-2020

Answer:

2.73

Step-by-step explanation:

james=5hrs

jared=6hrs  

1/5+1/6=1/x       x= Time together

6x/30x+5x/30x=30/30x

11x=30

x= 2 8/11

(2hrs 44min)

                                                     

Answer Link

Otras preguntas

3x+5=19 how do I solve this problem ???
write the standard form of 6.45 billion?
The Mahabharata and the Ramayana were two epic poems from this civilization.
a total of $21,000 is invested in two bonds that pay 4% and 7.5% simple interest. The bond with 7.5 % interest rate earned 6 times as much interest. as the bond
someone tell me what is 9/8 simplified
if a number is added to the numerator of 4/9 and the same number is subtracted from the denominator the result is -9. find the number
a force of 300N[S] is applied to a 50kg box on a rough floor. The frictional force is 200N. The acceleration is 2m/s^2. if the 300N force is removed after 4.0s
order from least to greatest 5.04,5.4,5.406,5.064
Factor completely x^4 +8x^2 -9
Using complete sentences, explain how to find the average rate of change for f(x) from x = 4 to x = 7. My equation is f(x) = - 2(x-6)^2 + 95