if 4 workers can complete a job in 12 days, how many days will it take 3 workers to complete the same job

Respuesta :

babygirl2821
babygirl2821 babygirl2821
  • 22-05-2020
Is there any answer or something
Answer Link

Otras preguntas

The state of Israel was created_____. A )Southwest B)Northeast C) pacific coast D) Great Lakes
2x−4y=20 whats the answer
Which of the following factors does not cause a shift in the labor demand​ curve?A. Changing technology.B. Changes in output prices.C. Changes in the wage rate.
What are the key points to writing a good conclusion
One way that demographers do their research on populationsize is to look at:OOOOA. inflation.B. the cost of living.C. fertility.D. reelection rates.​
the coordinance of three vertices of a rectangle are (4,3), (4,0), and (-2,0)what are the coordinates of the fourth vertex​
If the correlation between 2 variables is given as zero, the association between the 2 variable is
The three main categories of patents are?
what connotation do forbade, frick park, bums, and bridges in american childhood have
Would someone please break this down in a simple way on how to solve it.