antbanks9993 antbanks9993
  • 21-07-2020
  • Computers and Technology
contestada

The IT department sets up a user account and software. Which stage of the hardware lifecycle does this situation belong to?

Respuesta :

SerenaBochenek SerenaBochenek
  • 27-07-2020

Answer:

"Development" would be the correct answer.

Explanation:

  • All that would be required to complete the plan is designed mostly during the development or planning process.
  • The production process is finished whenever it's prepared to resume execution.
  • Local participants and perhaps suppliers are helped to bring in, a timetable would be managed to make, parts and equipment are decided to order, employee training should be given and many more.

Answer Link

Otras preguntas

Which of the following are made of repeating sugar units? Choose all answers that are correct. A. nucleic acids B. carbohydrates C. proteins D. lipids
How to write y+1=4/5(x-3) in standard form
Kate took a test and she got a grade between 80% and 95%, inclusive. What is the greatest percent error she could have?
The east coast of south america has a warmer current than the west coast of south america.true false
Which property of water allows it to absorb large amounts of heat energy and only slightly increase in temperature?
what are the difference between binary fission and mitosis
a ski lift carries people along a 220 meter
How did the greeks defeat the persians?
With the Exception of the first Amendment, which two of the first ten amendments to the constitution would most affect you if it were taken away? Explain your a
Which type of energy is transferred by vibrational waves 1. Nuclear 2. Light 3. Chemical 4. Sound