alisa9 alisa9
  • 23-09-2016
  • Mathematics
contestada

30men can finish 1/7of a work in 2days.18men will do othe remaining work in ?

Respuesta :

chumxo chumxo
  • 24-09-2016
7/7-1/7=6/7 is the rest of work
1/7 work takes 2days
6*1/7=6/7 work takes 6*2days=12days
30 men takes 12 days to finish the rest of work (6/7)
18 men takes 18*12/30= 7.2days
Answer Link

Otras preguntas

How do ethical concerns effect scientist research?
if 6 boys can do piece of work in 8 days, how many days will 16 boys do the same work at the same rate?​
What delegate at the Constitutional Convention pushed for a scrapping of the Articles and the institution of a new form of government?
Solve the equation for k. k=5/12 omg please help me
Read the beginning of the story below and consider how the characters, setting, and mood interact to drive the story forward: This was the moment Zachary had be
The top of a tree is 172/3 feet above sea level. The bottom of the lake is 1037, feet below sea level. What is the vertical distance from the bottom of the lake
Sid solved the following problem: 175.362 ÷ 100 = 17,536.2 Did Sid make a mistake? Yes, Sid multiplied instead of dividing. The correct answer should be 1.75362
describe how a sequence can be used to determine the height of the ball when it reaches its fourth peak
2. How can a gas at room temperature (like oxygen) become solid?
If Point M has a coordinate of -1 and MN = 7, what are the possible coordinates of point N?