srkhuntia560 srkhuntia560
  • 22-02-2021
  • Mathematics
contestada

1.
Rakesh can complete a work in 20 days. What part of the work can he
complete in 4 days?​

Respuesta :

chloelynnjeremiah
chloelynnjeremiah chloelynnjeremiah
  • 23-02-2021

Answer:

5 percent

Step-by-step explanation:

fnmdmrnrnrndndjxkdkekensnsnzksndkdd

Answer Link

Otras preguntas

The preliminary version of a security offer that is circulated to potential buyers before SEC approval (registration) is obtained is called a: Final prospectus
Symbiotic Relationships Concept Map. See worksheet attached.
Juan drank 3 quarts of water. Alfred drank 8 quarts. How many cups of water did they drink altogether?(no links will get brainliest)
Solve for X Please answer as fast as you can :)
What are the x-intercepts of the graph of y = x2 + 7x + 10?
Explain the relationships between at least a dozen members of the food web. Include at least one producer and one high-level consumer (carnivore).
The cost of plastic has increased in the production of water bottles. Which of the determinants of supply apply to this scenario? A. Price of resources B. Taxe
The sum of three numbers is 85. The third number is 7 more than the first. The second number is 2 times the third. What are the numbers?​
The measure of angle 1 is 39 degrees. What is the measure of the angle adjacent to angle 1?
que significa la equidad social