lxpoku lxpoku
  • 21-07-2021
  • Mathematics
contestada

12 workers take 4 hours to complete a job. How long would it take 15 workers to complete the job?

Respuesta :

ThatsTJ32
ThatsTJ32 ThatsTJ32
  • 21-07-2021

Answer:

3.75

Step-by-step explanation:

Answer Link

Otras preguntas

A crane lifts a 6.500 N weight 10 m in 180 seconds. What power is used?
nancy won circular shaped Olympic medal during the gymnastics competition. The medal has a diameter of 3 inches. What is the area of the Olympic medal, in terms
A four-digit serial number is to be created from the digits 0 through 9. How many of these serial numbers can be created if 0 can not be the first digit, no dig
Which basic emotion is facially expressed by brows drawn together?
How does the energy in carbon-rich shale transfer into crude?
Need help on number 3 please this is due tomorrow
What best expresses the attitude of the american founding fathers towards political parties?
A relay team ran a race. Each team member ran #1/4# of the distance. The whole race was #8/9# mile. How far did each team member run?
Is #3pi# a rational, irrational number, natural, whole or integer?
Identify the different cell types formed by mitosis