Why might one project have the highest pw while a different project has the largest irr? explain?

Respuesta :

W0lf93
W0lf93 W0lf93
  • 01-12-2017
The difference may lie in the project life, sometimes referenced as the planning horizon. A project may have a large internal rate of return (irr), but a very short project life. A second project might have a lower irr, but a much longer life. In that case, the second project will return less per year, but will provide a return for many more years, resulting in a higher pw.
Answer Link

Otras preguntas

Find the width of a cereal box that has a volume of 2,310 cm3 and is 22 cm long and 21 cm high.
How many galaxies similar in size to the milky way would you expect to find, on average, in cubes of that same size? in order to simplify the problem, assume th
What is the MOST likely reason the author included Aadya Joshi’s plant database?
No (Uds. -hablar) del tema delante de mi madre.
How do you think that the increased awareness on the dangers of over-consumption of sugar has impacted the baked goods industry? How about the increased popular
Which equation matches the table? (I have a screenshot) If I get this wrong I will lose my 57 streak :(
In Kennedy's Inaugural Address, what does he liken the United States to should foreign countries decide to come after us? A. a steel fortress B. impenetrable wa
choose all numbers that could be common denominators for 2/3 and 5/6 ​
how did achievements of jovita idar affect political economics or social aspects of lifetime
will make brainliest help please.