elopezhilario9971 elopezhilario9971
  • 25-11-2017
  • Social Studies
contestada

Who is primarily responsible for facilitation, when required, in scrum meetings?

Respuesta :

meerkat18
meerkat18 meerkat18
  • 05-12-2017
Scrum meetings are facilitated by the Scrum master. Scrum master manages the exchange of information and  facilitates fast-developing team. Its role is challenging because it depends on the priority that is set by the owner. It should delivers the backlogs in time with the best quality.
Answer Link

Otras preguntas

Drew worked 8.5 hours. During that time, he earned $119. At this rate, how much did he make per hour?
PLEASE HELP ASAP! NEED HELP!
N-24/8 = N/6 N equals to what?
which model of the atom was modeled after the solar system? a. Dalton's model b. Tomson's model c. Rutherford's model d.Bohr's model
if the temperature was 89 degrees Fahrenheit would you wear a bathing suit or a jacket
Maya visit the movie rental store.on one wall, there are 6dvds on each of 5 shelves.on another wall, there are 4 dvds on each of 4 shelves. How many DVD's a re
When Hrothulf stands in the yard and "thinks out loud," one opinion he has of society is that
What conclusions cannot be drawn about free verse poems? Free verse poems follow a set pattern of line syllables. Free verse poems follows two set pattern of l
HELP 20 POINTS WILL GIVE BRAINILIST TO FIRST WHO ANSWERS! HELP ASAP!
What is the unit rate for 3/4?