A _____ might involve maximums for one or more resources, such as time, dollars, or people.
a. ​milestone
b. ​constraint
c. ​task id
d. ​successor task

Respuesta :

andriansp andriansp
  • 01-02-2018
I believe the answer is B. constraint.
A constraint usually made because of a limited amount for tyof resourcerce that exist for certain type of factors. The purpose of a constraint is usually to make sure that the organization could still achieve its goal while staying on the budget that they have previously created.
Answer Link

Otras preguntas

What is the effect of the following on the volume of 1 mol of an ideal gas? (a) The initial pressure is 722 torr, and the final pressure is 0.950 atm; the initi
(a) Which region of Earth’s crust is not involved in the phosphorus cycle?
Alternative Fuel Engineering - The recent Ukraine Russia war has seen oil prices increase by almost 200 %. This has severely dented the common man’s pocket bec
Geometry!!! Please help!!!​
Please do fast doesn't have to be long explanation
3.2 Determine now the total surface area (TSA) of the cube below. 10cm 3. The total surface area of a rectangle prism: (3) what is the answer
What is true about the time frames of diseases 100 years ago in the united states?
Determine the shape around each central atom in each molecule, and explain any deviation from ideal bond angles: (b) CH₃¬O¬CH₂CH₃
“Androclus and the Lion” by James Baldwin theme
What is the molecular formula of each compound? (d) Empirical formula C₇H₄O₂ (m =5 240.20 g/mol)