jefarmjefarm1625 jefarmjefarm1625
  • 25-02-2018
  • Mathematics
contestada

If A completes a particular work in 8 days and B the same work in 24 days. How many days will it take if they work together?

Respuesta :

Аноним Аноним
  • 25-02-2018
A:
1 day = 1/8 of work

B:
1 day = 1/24 of the work

Together:
 1 day = A + B = 1/8 + 1/24 = 4/24 = 1/6

1 day = 1/6 of work
1/6 x 6 of work = 1 x 6 days
work =  6 days 

Answer Link

Otras preguntas

Refer to the following illustration to answer this question. Waves To measure one wavelength, you would measure the distance between __________. Question 16 op
How does the 18th Amendment prohibit the consumption of alcohol?
GEOMETRY PLEASE HELP!!
4. Synthetic fabrics are often superior to natural fabrics and that they are:
Which one of the following statements about fractions is correct? Question 9 options: 1/3 is an improper fraction. 9/7 is a proper fraction. 5/16 is a mixed num
what is two x square plus x =0​
The figure below shows the graph of function f with domain [-1,1] and range [0,1].
Why . was it called said like the Panas were above the law?
4. What does an r value of -0.89 suggest about two variables? A. That an increase in the independent variable causes the dependent variable to decrease B. That
Could someone please help me?